Logout
Click here for Pulp & Paper Radio International
The Paperitalo Library
Free Downloads
Search
My Profile
Login
Andritz to supply new recovery boiler, evaporation plant and power boiler to Green Bay Packaging in Arkansas, USA
Comment Print

International technology group Andritz has received an order from Green Bay Packaging Inc. to supply a recovery boiler, evaporation plant and power boiler for its pulp mill in Morrilton, Arkansas, USA. The value of the order will not be disclosed.

The scope of supply, on an EPS (Engineering, Procurement, Supply) basis, includes:

• Recovery boiler including automation and digitalization solutions such as Smart Smelt Spout Robots, intelligent measurements and condition monitoring solutions as well as process controls.
• Lamella evaporation plant.
• Biomass-fired power boiler based on the EcoFluid bubbling fluidized bed design.

Start-up of the new equipment is scheduled for the second half of 2027.

Founded in 1933, Green Bay Packaging is a family-owned company that operates over 40 facilities across 16 states. Its operations include corrugated container plants, a folding carton facility, and recycled and virgin containerboard mills.

Andritz Pulp & Paper provides sustainable technology, automation, and service solutions for the production of all types of pulp, paper, board and tissue.

Readers, please tell your suppliers that you read Paperitalo Publications

 


Powered by Bondware
News Publishing Software

The browser you are using is outdated!

You may not be getting all you can out of your browsing experience
and may be open to security risks!

Consider upgrading to the latest version of your browser or choose on below: